• Contact Us
    • CGL Godalming
    • CGL Harrogate
    • CGL Exeter
    • CGL London
    • CGL Kent
    • CGL Southampton
    • CGL Dublin
  • About CGL
    • Innovation
    • Thought Leadership
    • Our Culture
    • Community Outreach
    • Mission Vision and Values
  • GeoEngineering Blog
    • CGL Papers
  • News
  • Upcoming Events
  • Why CGL
    • Awards
    • Our Reputation
    • Health, Safety, Environment and Quality Management
  • Careers
    • Current Vacancies
    • Careers for Graduates in Civil Engineering or Geology
    • Undergraduate Placements
    • Training Programmes
    • Inclusion and Diversity
CGL
  • Home
  • Services
    • Geotechnical
      • Basement Impact and Ground Movement Assessment
      • Geotechnical Design
      • Earthworks Design and Control
      • Construction Support, Supervision and Monitoring
    • Geoenvironmental
      • Geoenvironmental Risk Assessments
      • Material Management and Waste Assessment
      • Remediation Design, Monitoring and Verification
    • Site Investigation
      • Site Feasibility and Planning Constraints
      • Ground Investigation
      • Construction Monitoring, Foundation Inspection and Verification
      • Monitoring, Instrumentation and Testing
      • Digital Imagery Analysis
    • Temporary Works
      • Working Platform Design
      • Excavation Stability
      • Observational Method
      • Basement Propping Schemes
  • Our Projects
  • Sectors
    • Residential
    • Commercial
    • Energy Sector
    • Infrastructure Sector
  • People
    • Paul Sheehan
    • Richard Pennock
    • Mark Creighton
    • Dan Matthews
    • Phillip West
    • Robin Slade
    • Jo Strange
    • Dr David Giles
    • Joseph Slattery
    • Adam Branson
    • Adam Cadman
    • Kirsty Poore
    • Steve Morgan
    • Mark Stringer
    • Marina Kirkpatrick
    • Sarah McCourt
    • Dr Kimberley Neville
    • Geoff Faro
    • Antonella Galliani
    • Gareth Lewis
    • Amir Abbasi
    • Dr Marianne Brett
    • Nick Langdon
    • Mio Hodgson
Select Page
  1. Home
  2. category
  3. Temporary Works
The Deepest Basement Under Construction in London

The Deepest Basement Under Construction in London

by Katie Hatchley | Sep 24, 2020 | Geotechnical Services, Site Investigation, Temporary Works

Fantastic to see the progress on site at Welbeck Street, just north of Oxford Street and Bond Street Station London. CGL’s involvement at Wellbeck Street includes full scope SI, Geotech, Geo-Structural and Temporary Works Design from a cross-office...
CGL Provides Temporary Design Works for the Development of the Fitzpatrick Building

CGL Provides Temporary Design Works for the Development of the Fitzpatrick Building

by Tracy Stonard | Jul 23, 2020 | Temporary Works

CGL was commissioned by Volker Fitzpatrick to undertake a site investigation and robust temporary works design for the proposed development at The Fitzpatrick Building, located north of Kings Cross. The proposed works consisted of demolishing an existing six-storey...
Guide to Tower Crane Foundation & Tie Design (C761)

Guide to Tower Crane Foundation & Tie Design (C761)

by Katie Hatchley | Feb 5, 2019 | Temporary Works

This week CIRIA releases the long awaited update of CIRIA C654 Tower Crane Stability Guidance.  Much has changed since the first publication of guidance on tower crane stability in 2006, including implementation of Eurocodes and withdrawal of certain relevant British...
CGL Present at VolkerFitzpatrick HSEQ Event

CGL Present at VolkerFitzpatrick HSEQ Event

by Katie Hatchley | Oct 29, 2018 | Health and Safety, Temporary Works

CGL presented at a HSEQ (Health Safety Environment Quality) event hosted by VolkerFitzpatrick, with the topic of presentations focused around Temporary Works. Speakers Mark Creighton, Anastasios Kampaktsis and Joseph Birnie from the CGL London office addressed CGL’s...
Support for Mobile Crane Lift Over River Witham

Support for Mobile Crane Lift Over River Witham

by admin | Aug 24, 2017 | Projects, Temporary Works

Temporary works design for a large underbridge over the River Witham with difficult ground conditions. CGL was recently appointed by AMCO Rail to provide temporary works design support for its reconstruction of a four span rail bridge over the River Witham close to...
Innovative Temporary Works Buttress Pile System Performing Well

Innovative Temporary Works Buttress Pile System Performing Well

by admin | Mar 20, 2017 | Innovation, Projects, Temporary Works

The photos above and below show CGL’s temporary works design performing within predicted limits during excavation and construction of deep basement at a large residential development in Prince of Wales Drive, Battersea, London. The pictures show a section of our...
« Older Entries

Recent Posts

  • CGL Retains Investors In People Gold Accreditation
  • CGL Supporting Women’s Engineering Society’s ‘Lottie Tour’
  • Fort Augustus to Skye OHL Reinforcement – GE Awards finalist at the 2022 GE Awards

Categories

Archives

Contact us:

Godalming: 01483 310600

Harrogate: 01423 276000

Exeter: 01392 439905

London: 020 3096 7567

Kent: 01622 858545

Southampton: 07718 479598

Dublin: +353 (0) 1554 6210

Company number: 2993862
Card Geotechnics Limited.
All rights reserved

Popular links

  • Why CGL
  • About CGL
  • Contact Us
  • People
  • Terms and Conditions
  • Privacy Policy

Services

  • Basement Impact and Ground Movement Assessment
  • Geotechnical Design
  • Geoenvironmental Risk Assessments
  • Remediation Design, Monitoring and Verification
  • Site Feasibility and Planning Constraints
  • Excavation Stability
  • Ground Investigation